Project : Reservoir Safety Works
Client : Private Client
Date of Services : 2015 to 2018
Bayham Lake was formed in the early 19th century as part of Humphry Repton’s landscaping scheme for the Bayham estate in Kent. Following a significant overtopping event in October 2000, recommendations were made by a Reservoir Panel Engineer requiring additional spillway capacity to be provided.
Stillwater Associates was commissioned to investigate appropriate options, ensuring no detriment to the heritage nature of the site, followed by the detailed design, assistance with obtaining planning permission, running the tender process to appoint a contractor and supervision of construction works on site.
The design consisted of a 14m long reinforced concrete drop structure weir on a sheet piled cut-off wall, a 10m wide reinforced concrete cascade spillway with a series of stilling pools and a new reinforced concrete access bridge. Careful attention was paid to the heritage nature of the site with the use of appropriate sandstone finishes for many parts of the structure, including local Kentish sandstone cladding on the access bridge parapet walls.
/*php $parentPage = Page::getByID(346); if (is_object($parentPage) && $parentPage->getCollectionID()) { $children = $parentPage->getCollectionChildren(); foreach ($children as $child) { $next_page_url = $child->getCollectionLink(); if ($child->getCollectionID() !== $c->getCollectionID()) { echo 'Next case study'; break; }elseif($child->getCollectionID() == $c->getCollectionID()){ continue; } } }*/ ?>