Bayham Lake

Bayham Lake Heritage: New Spillway

Project : Reservoir Safety Works

Client : Private Client

Date of Services : 2015 to 2018

Scope of work

  • A feasibility study to look at the various options of how the spillway capacity could be increased, including attending consultation meetings with various stakeholders
  • Support to environmental and planning consultants to provide a coordinated service
  • Detailed design, preparation of tender documents and procurement of works
  • Contract administration and supervision of works on site
  • Reservoir Act “Qualified Civil Engineer” to oversee the design and construction and certify the completed works

Project description

Bayham Lake was formed in the early 19th century as part of Humphry Repton’s landscaping scheme for the Bayham estate in Kent.  Following a significant overtopping event in October 2000, recommendations were made by a Reservoir Panel Engineer requiring additional spillway capacity to be provided.  

Stillwater Associates was commissioned to investigate appropriate options, ensuring no detriment to the heritage nature of the site, followed by the detailed design, assistance with obtaining planning permission, running the tender process to appoint a contractor and supervision of construction works on site.  

The design consisted of a 14m long reinforced concrete drop structure weir on a sheet piled cut-off wall, a 10m wide reinforced concrete cascade spillway with a series of stilling pools and a new reinforced concrete access bridge.  Careful attention was paid to the heritage nature of the site with the use of appropriate sandstone finishes for many parts of the structure, including local Kentish sandstone cladding on the access bridge parapet walls.

getCollectionID()) { $children = $parentPage->getCollectionChildren(); foreach ($children as $child) { $next_page_url = $child->getCollectionLink(); if ($child->getCollectionID() !== $c->getCollectionID()) { echo 'Next case study'; break; }elseif($child->getCollectionID() == $c->getCollectionID()){ continue; } } }*/ ?>

Next case study

Other recent projects

Eyebrook - Cropped.jpg
Eyebrook ReservoirNew Auxiliary Spillway Scope of work: Reservoir engineering services throughout the project, including:  design, planning assistance, construction tender process and technical support during construction
052a.JPG
Vann LakeNew Spillway Channel Construction Scope of work: Reservoir engineering services throughout the project, including; tendering, construction and ongoing environmental support.
  • Home
  • About Us
  • Clients
  • Services
  • Projects
  • Team
  • Careers
  • Contact
  • Privacy and cookies
Contact Stillwater

Email: office@stillwater-associates.co.uk
Phone: 01737 768237

Stillwater Associates
Chapter House
33 London Road
Reigate
Surrey RH2 9HZ

Follow Stillwater

© 2026 Stillwater Associates – Reservoir Safety & Water Consultancy