Vann Lake New Spillway Channel Construction

Project : New Spillway Channel Construction

Client : Surrey Wildlife Trust

Date of Services : 2012 to 2013

Scope of work

  • Design of remedial works
  • Pre-construction advice with regard to environmental licensing
  • Construction supervision
  • Consultation support to the client with local residents
  • Reservoir Act “Qualified Civil Engineer” to oversee the design and construction and certify the completed works

Project description

Vann Lake is a 55,000m3 reservoir retained by an 8m high earth dam in rural Surrey.  The reservoir dates from around 1750 and is now part of a site of Special Scientific Interest (SSSI), designated for a number of features water and woodland features.

The project was implemented following recommendations in the interests of safety from a statutory inspection under Section 10 of the Reservoirs Act 1975.  The works were required to provide a spillway which would safely pass peak flows from a 1 in 150 flood event with sufficient freeboard.

The main scheme works comprised raising the dam crest with clay fill and constructing a reinforced concrete spillway channel to replace a trapezoidal channel; the original channel was lined with interlocking precast concrete blocks which had been washed out during regular spillway flows.  Ancillary works included modifying the spillway weir crest level, constructing a new gabion headwall to replace a deficient structure built about 12 years earlier and fitting a modern trash screen on the existing piped overflow.  The dam crest carries a public footpath and the raising included installation of a concrete kerb along the crest; this provides a defined crest level so that there would be an even spread of water across the whole dam in the very rare event of dam overtopping.

Construction work was preceded by environmental mitigation works, such as tree felling, grass strimming and reptile exclusion fencing undertaken by Surrey Wildlife Trust with support from Stillwater.

Next case study

Other recent projects

Eyebrook - Cropped.jpg
Eyebrook ReservoirNew Auxiliary Spillway Scope of work: Reservoir engineering services throughout the project, including:  design, planning assistance, construction tender process and technical support during construction
052a.JPG
Vann LakeNew Spillway Channel Construction Scope of work: Reservoir engineering services throughout the project, including; tendering, construction and ongoing environmental support.
  • Home
  • About Us
  • Clients
  • Services
  • Projects
  • Team
  • Careers
  • Contact
  • Privacy and cookies
Contact Stillwater

Email: office@stillwater-associates.co.uk
Phone: 01737 768237

Stillwater Associates
Chapter House
33 London Road
Reigate
Surrey RH2 9HZ

Follow Stillwater

© 2026 Stillwater Associates – Reservoir Safety & Water Consultancy